Add comprehensive specifications and planning documents for Reference Board Viewer application. Include detailed data model, API contracts, quickstart guide, and task breakdown for implementation. Ensure all artifacts are aligned with project objectives and constitutional principles.

This commit is contained in:
Danilo Reyes
2025-11-01 22:19:39 -06:00
parent d5a1819e2f
commit 58f463867e
8 changed files with 4371 additions and 475 deletions

View File

@@ -0,0 +1,283 @@
# ✅ TASKS GENERATED: Implementation Ready
**Date:** 2025-11-02
**Feature:** 001-reference-board-viewer
**Branch:** 001-reference-board-viewer
**Status:** ✅ Ready for Week 1 Execution
---
## Summary
Comprehensive task breakdown generated with **331 actionable tasks** organized by user story for independent, parallel implementation.
---
## Generated Artifacts
### tasks.md Statistics
- **Total Tasks:** 331
- **Phases:** 25 (1 setup + 1 foundational + 18 user stories + 5 cross-cutting)
- **User Stories:** 18 (mapped from FR1-FR18 in spec.md)
- **Parallelizable Tasks:** 142 tasks marked with [P]
- **Average Tasks per User Story:** 18 tasks
### Task Organization
**By Priority:**
- Critical stories (US1-US6): 126 tasks
- High priority stories (US7-US13): 88 tasks
- Medium priority stories (US14-US16): 27 tasks
- Low priority stories (US17-US18): 14 tasks
- Infrastructure/Polish: 76 tasks
**By Component:**
- Backend tasks: ~160 tasks
- Frontend tasks: ~145 tasks
- Infrastructure: ~26 tasks
---
## User Story Mapping
Each functional requirement from spec.md mapped to user story:
| Story | Requirement | Priority | Tasks | Week |
|-------|-------------|----------|-------|------|
| US1 | FR1: Authentication | Critical | 20 | 2 |
| US2 | FR2: Board Management | Critical | 20 | 3 |
| US3 | FR4: Image Upload | Critical | 24 | 4 |
| US4 | FR12: Canvas Navigation | Critical | 11 | 5 |
| US5 | FR5: Image Positioning | Critical | 19 | 5-6 |
| US6 | FR8: Transformations | Critical | 12 | 6 |
| US7 | FR9: Multi-Selection | High | 11 | 7 |
| US8 | FR10: Clipboard Operations | High | 10 | 7 |
| US9 | FR6: Alignment & Distribution | High | 9 | 10 |
| US10 | FR7: Grouping & Annotations | High | 17 | 9 |
| US11 | FR3: Board Sharing | High | 19 | 11 |
| US12 | FR15: Export & Download | High | 12 | 12 |
| US13 | FR16: Adaptive Quality | High | 10 | 13 |
| US14 | FR17: Image Library & Reuse | Medium | 12 | 14 |
| US15 | FR11: Command Palette | Medium | 7 | 14 |
| US16 | FR13: Focus Mode | Medium | 8 | 14 |
| US17 | FR14: Slideshow Mode | Low | 7 | 14 |
| US18 | FR18: Auto-Arrange | Low | 7 | 14 |
---
## Task Format Validation ✅
All 331 tasks follow the required format:
```
- [ ] [T###] [P?] [US#?] Description with file path
```
**Examples:**
```
✅ - [ ] T036 [P] [US1] Create User model in backend/app/database/models/user.py
✅ - [ ] T100 [US4] Initialize Konva.js Stage in frontend/src/lib/canvas/Stage.svelte
✅ - [ ] T163 [US9] Implement align top/bottom in frontend/src/lib/canvas/operations/align.ts
```
**Validation Results:**
- ✅ All tasks have checkbox `- [ ]`
- ✅ All tasks have sequential ID (T001-T331)
- ✅ Parallelizable tasks marked with [P]
- ✅ User story tasks have [US#] label
- ✅ All tasks have specific file paths
- ✅ All tasks are actionable (clear description)
---
## Parallel Execution Opportunities
### Phase 1 (Setup): 13 Parallel Tasks
Tasks T002-T020 (excluding sequential dependencies) can run simultaneously.
**Example Team Split:**
- Developer 1: Nix config (T002, T003, T004, T009, T317, T318)
- Developer 2: Backend setup (T005, T007, T011, T013, T015, T017, T018)
- Developer 3: Frontend setup (T006, T008, T012, T014, T016)
### Phase 2 (Foundational): 10 Parallel Tasks
Tasks T021-T035 - most can run in parallel after T021-T024 complete.
### Phase 3+ (User Stories): Full Parallelization
Each user story is independent after foundational phase:
**Parallel Story Development (Example Week 9-12):**
- Team A: US9 (Alignment) + US12 (Export)
- Team B: US10 (Groups) + US13 (Quality)
- Team C: US11 (Sharing)
All teams work simultaneously on different stories!
---
## MVP Scope Recommendation
For fastest time-to-market, implement in this order:
### MVP Phase 1 (Weeks 1-8) - 120 Tasks
**Deliverable:** Functional reference board app
- Phase 1-2: Setup (35 tasks)
- US1: Authentication (20 tasks)
- US2: Board Management (20 tasks)
- US3: Image Upload (24 tasks)
- US4-US5: Canvas basics (22 tasks)
- US6: Transformations (12 tasks)
**Result:** Users can create boards, upload images, position and transform them.
### MVP Phase 2 (Weeks 9-12) - 88 Tasks
**Deliverable:** Collaboration features
- US7-US10: Multi-select, clipboard, alignment, groups (47 tasks)
- US11: Sharing (19 tasks)
- US12: Export (12 tasks)
- US13: Adaptive quality (10 tasks)
**Result:** Full collaboration and export capabilities.
### Polish Phase (Weeks 13-16) - 123 Tasks
**Deliverable:** Production-ready
- US14-US18: Library, palette, focus, slideshow, arrange (41 tasks)
- Performance optimization (10 tasks)
- Testing (15 tasks)
- Accessibility (13 tasks)
- Deployment (23 tasks)
- Documentation (21 tasks)
**Result:** Polished, tested, deployed application.
---
## Independent Test Criteria
Each user story phase includes independent test criteria that can be verified without other features:
**Example (US1 - Authentication):**
- ✅ Users can register with valid email/password
- ✅ Users can login and receive JWT token
- ✅ Protected endpoints reject unauthenticated requests
- ✅ Password validation enforces complexity rules
This enables:
- Feature flag rollouts (deploy incomplete features, hidden behind flags)
- A/B testing individual features
- Incremental beta releases
- Independent QA validation
---
## Technology Stack Reference
**All tasks reference this verified stack:**
**Frontend:**
- Svelte + SvelteKit (framework)
- Konva.js (canvas library)
- Vite (build tool)
- Vitest + Testing Library (testing)
**Backend:**
- FastAPI (web framework)
- SQLAlchemy + Alembic (database ORM + migrations)
- Pydantic (validation)
- Pillow + ImageMagick (image processing)
- pytest (testing)
**Infrastructure:**
- PostgreSQL (database)
- MinIO (S3-compatible storage)
- Nginx (reverse proxy)
- Nix (deployment)
**All verified in nixpkgs** - see VERIFICATION-COMPLETE.md
---
## Next Actions
### Immediate (Today)
1. **Review tasks.md:**
```bash
cat specs/001-reference-board-viewer/tasks.md
```
2. **Understand the format:**
- [T###] = Task ID
- [P] = Parallelizable
- [US#] = User Story label
3. **Choose approach:**
- Full MVP (120 tasks, Weeks 1-8)
- OR Complete v1.0 (331 tasks, Weeks 1-16)
### This Week (Week 1)
Start with Phase 1 (T001-T020):
```bash
# T001: Initialize Git structure
# T002: Create flake.nix
# T003: Update shell.nix
# ... follow tasks.md sequentially
```
### Team Organization
If you have a team:
- **Backend Developer:** Focus on backend tasks in each phase
- **Frontend Developer:** Focus on frontend tasks in each phase
- **Full-Stack:** Can work on any tasks marked [P]
If solo:
- Follow tasks sequentially (T001 → T002 → T003...)
- Skip tasks marked [P] in same phase to avoid context switching
- Complete one user story fully before moving to next
---
## Files Created
```
specs/001-reference-board-viewer/
├── tasks.md ✅ 331 tasks, 25 phases (THIS FILE)
├── plan.md ✅ 16-week implementation plan
├── spec.md ✅ 18 functional requirements
├── data-model.md ✅ Database schema
├── tech-research.md ✅ Technology analysis
├── nix-package-verification.md ✅ Package verification
├── VERIFICATION-COMPLETE.md ✅ Verification summary
├── PLANNING-COMPLETE.md ✅ Planning summary
├── TASKS-GENERATED.md ✅ This document
├── quickstart.md ✅ Developer guide
├── contracts/
│ └── api.yaml ✅ OpenAPI 3.0 spec
└── checklists/
└── requirements.md ✅ Quality validation
Total: ~6,500 lines of comprehensive planning & task breakdown
```
---
## Conclusion
**Task Generation:** COMPLETE
**Format Validation:** PASSED
**Dependency Analysis:** MAPPED
**Parallel Opportunities:** IDENTIFIED
**MVP Scope:** DEFINED
**Status:** ✅ READY TO BEGIN IMPLEMENTATION
Start with T001 and work through sequentially, or split among team members using the parallel execution examples!
🚀 **Let's build this!**