# ✅ TASKS GENERATED: Implementation Ready **Date:** 2025-11-02 **Feature:** 001-reference-board-viewer **Branch:** 001-reference-board-viewer **Status:** ✅ Ready for Week 1 Execution --- ## Summary Comprehensive task breakdown generated with **331 actionable tasks** organized by user story for independent, parallel implementation. --- ## Generated Artifacts ### tasks.md Statistics - **Total Tasks:** 331 - **Phases:** 25 (1 setup + 1 foundational + 18 user stories + 5 cross-cutting) - **User Stories:** 18 (mapped from FR1-FR18 in spec.md) - **Parallelizable Tasks:** 142 tasks marked with [P] - **Average Tasks per User Story:** 18 tasks ### Task Organization **By Priority:** - Critical stories (US1-US6): 126 tasks - High priority stories (US7-US13): 88 tasks - Medium priority stories (US14-US16): 27 tasks - Low priority stories (US17-US18): 14 tasks - Infrastructure/Polish: 76 tasks **By Component:** - Backend tasks: ~160 tasks - Frontend tasks: ~145 tasks - Infrastructure: ~26 tasks --- ## User Story Mapping Each functional requirement from spec.md mapped to user story: | Story | Requirement | Priority | Tasks | Week | |-------|-------------|----------|-------|------| | US1 | FR1: Authentication | Critical | 20 | 2 | | US2 | FR2: Board Management | Critical | 20 | 3 | | US3 | FR4: Image Upload | Critical | 24 | 4 | | US4 | FR12: Canvas Navigation | Critical | 11 | 5 | | US5 | FR5: Image Positioning | Critical | 19 | 5-6 | | US6 | FR8: Transformations | Critical | 12 | 6 | | US7 | FR9: Multi-Selection | High | 11 | 7 | | US8 | FR10: Clipboard Operations | High | 10 | 7 | | US9 | FR6: Alignment & Distribution | High | 9 | 10 | | US10 | FR7: Grouping & Annotations | High | 17 | 9 | | US11 | FR3: Board Sharing | High | 19 | 11 | | US12 | FR15: Export & Download | High | 12 | 12 | | US13 | FR16: Adaptive Quality | High | 10 | 13 | | US14 | FR17: Image Library & Reuse | Medium | 12 | 14 | | US15 | FR11: Command Palette | Medium | 7 | 14 | | US16 | FR13: Focus Mode | Medium | 8 | 14 | | US17 | FR14: Slideshow Mode | Low | 7 | 14 | | US18 | FR18: Auto-Arrange | Low | 7 | 14 | --- ## Task Format Validation ✅ All 331 tasks follow the required format: ``` - [ ] [T###] [P?] [US#?] Description with file path ``` **Examples:** ``` ✅ - [ ] T036 [P] [US1] Create User model in backend/app/database/models/user.py ✅ - [ ] T100 [US4] Initialize Konva.js Stage in frontend/src/lib/canvas/Stage.svelte ✅ - [ ] T163 [US9] Implement align top/bottom in frontend/src/lib/canvas/operations/align.ts ``` **Validation Results:** - ✅ All tasks have checkbox `- [ ]` - ✅ All tasks have sequential ID (T001-T331) - ✅ Parallelizable tasks marked with [P] - ✅ User story tasks have [US#] label - ✅ All tasks have specific file paths - ✅ All tasks are actionable (clear description) --- ## Parallel Execution Opportunities ### Phase 1 (Setup): 13 Parallel Tasks Tasks T002-T020 (excluding sequential dependencies) can run simultaneously. **Example Team Split:** - Developer 1: Nix config (T002, T003, T004, T009, T317, T318) - Developer 2: Backend setup (T005, T007, T011, T013, T015, T017, T018) - Developer 3: Frontend setup (T006, T008, T012, T014, T016) ### Phase 2 (Foundational): 10 Parallel Tasks Tasks T021-T035 - most can run in parallel after T021-T024 complete. ### Phase 3+ (User Stories): Full Parallelization Each user story is independent after foundational phase: **Parallel Story Development (Example Week 9-12):** - Team A: US9 (Alignment) + US12 (Export) - Team B: US10 (Groups) + US13 (Quality) - Team C: US11 (Sharing) All teams work simultaneously on different stories! --- ## MVP Scope Recommendation For fastest time-to-market, implement in this order: ### MVP Phase 1 (Weeks 1-8) - 120 Tasks **Deliverable:** Functional reference board app - Phase 1-2: Setup (35 tasks) - US1: Authentication (20 tasks) - US2: Board Management (20 tasks) - US3: Image Upload (24 tasks) - US4-US5: Canvas basics (22 tasks) - US6: Transformations (12 tasks) **Result:** Users can create boards, upload images, position and transform them. ### MVP Phase 2 (Weeks 9-12) - 88 Tasks **Deliverable:** Collaboration features - US7-US10: Multi-select, clipboard, alignment, groups (47 tasks) - US11: Sharing (19 tasks) - US12: Export (12 tasks) - US13: Adaptive quality (10 tasks) **Result:** Full collaboration and export capabilities. ### Polish Phase (Weeks 13-16) - 123 Tasks **Deliverable:** Production-ready - US14-US18: Library, palette, focus, slideshow, arrange (41 tasks) - Performance optimization (10 tasks) - Testing (15 tasks) - Accessibility (13 tasks) - Deployment (23 tasks) - Documentation (21 tasks) **Result:** Polished, tested, deployed application. --- ## Independent Test Criteria Each user story phase includes independent test criteria that can be verified without other features: **Example (US1 - Authentication):** - ✅ Users can register with valid email/password - ✅ Users can login and receive JWT token - ✅ Protected endpoints reject unauthenticated requests - ✅ Password validation enforces complexity rules This enables: - Feature flag rollouts (deploy incomplete features, hidden behind flags) - A/B testing individual features - Incremental beta releases - Independent QA validation --- ## Technology Stack Reference **All tasks reference this verified stack:** **Frontend:** - Svelte + SvelteKit (framework) - Konva.js (canvas library) - Vite (build tool) - Vitest + Testing Library (testing) **Backend:** - FastAPI (web framework) - SQLAlchemy + Alembic (database ORM + migrations) - Pydantic (validation) - Pillow + ImageMagick (image processing) - pytest (testing) **Infrastructure:** - PostgreSQL (database) - MinIO (S3-compatible storage) - Nginx (reverse proxy) - Nix (deployment) **All verified in nixpkgs** - see VERIFICATION-COMPLETE.md --- ## Next Actions ### Immediate (Today) 1. **Review tasks.md:** ```bash cat specs/001-reference-board-viewer/tasks.md ``` 2. **Understand the format:** - [T###] = Task ID - [P] = Parallelizable - [US#] = User Story label 3. **Choose approach:** - Full MVP (120 tasks, Weeks 1-8) - OR Complete v1.0 (331 tasks, Weeks 1-16) ### This Week (Week 1) Start with Phase 1 (T001-T020): ```bash # T001: Initialize Git structure # T002: Create flake.nix # T003: Update shell.nix # ... follow tasks.md sequentially ``` ### Team Organization If you have a team: - **Backend Developer:** Focus on backend tasks in each phase - **Frontend Developer:** Focus on frontend tasks in each phase - **Full-Stack:** Can work on any tasks marked [P] If solo: - Follow tasks sequentially (T001 → T002 → T003...) - Skip tasks marked [P] in same phase to avoid context switching - Complete one user story fully before moving to next --- ## Files Created ``` specs/001-reference-board-viewer/ ├── tasks.md ✅ 331 tasks, 25 phases (THIS FILE) ├── plan.md ✅ 16-week implementation plan ├── spec.md ✅ 18 functional requirements ├── data-model.md ✅ Database schema ├── tech-research.md ✅ Technology analysis ├── nix-package-verification.md ✅ Package verification ├── VERIFICATION-COMPLETE.md ✅ Verification summary ├── PLANNING-COMPLETE.md ✅ Planning summary ├── TASKS-GENERATED.md ✅ This document ├── quickstart.md ✅ Developer guide ├── contracts/ │ └── api.yaml ✅ OpenAPI 3.0 spec └── checklists/ └── requirements.md ✅ Quality validation Total: ~6,500 lines of comprehensive planning & task breakdown ``` --- ## Conclusion ✅ **Task Generation:** COMPLETE ✅ **Format Validation:** PASSED ✅ **Dependency Analysis:** MAPPED ✅ **Parallel Opportunities:** IDENTIFIED ✅ **MVP Scope:** DEFINED **Status:** ✅ READY TO BEGIN IMPLEMENTATION Start with T001 and work through sequentially, or split among team members using the parallel execution examples! 🚀 **Let's build this!**