8.0 KiB
✅ TASKS GENERATED: Implementation Ready
Date: 2025-11-02
Feature: 001-reference-board-viewer
Branch: 001-reference-board-viewer
Status: ✅ Ready for Week 1 Execution
Summary
Comprehensive task breakdown generated with 331 actionable tasks organized by user story for independent, parallel implementation.
Generated Artifacts
tasks.md Statistics
- Total Tasks: 331
- Phases: 25 (1 setup + 1 foundational + 18 user stories + 5 cross-cutting)
- User Stories: 18 (mapped from FR1-FR18 in spec.md)
- Parallelizable Tasks: 142 tasks marked with [P]
- Average Tasks per User Story: 18 tasks
Task Organization
By Priority:
- Critical stories (US1-US6): 126 tasks
- High priority stories (US7-US13): 88 tasks
- Medium priority stories (US14-US16): 27 tasks
- Low priority stories (US17-US18): 14 tasks
- Infrastructure/Polish: 76 tasks
By Component:
- Backend tasks: ~160 tasks
- Frontend tasks: ~145 tasks
- Infrastructure: ~26 tasks
User Story Mapping
Each functional requirement from spec.md mapped to user story:
| Story | Requirement | Priority | Tasks | Week |
|---|---|---|---|---|
| US1 | FR1: Authentication | Critical | 20 | 2 |
| US2 | FR2: Board Management | Critical | 20 | 3 |
| US3 | FR4: Image Upload | Critical | 24 | 4 |
| US4 | FR12: Canvas Navigation | Critical | 11 | 5 |
| US5 | FR5: Image Positioning | Critical | 19 | 5-6 |
| US6 | FR8: Transformations | Critical | 12 | 6 |
| US7 | FR9: Multi-Selection | High | 11 | 7 |
| US8 | FR10: Clipboard Operations | High | 10 | 7 |
| US9 | FR6: Alignment & Distribution | High | 9 | 10 |
| US10 | FR7: Grouping & Annotations | High | 17 | 9 |
| US11 | FR3: Board Sharing | High | 19 | 11 |
| US12 | FR15: Export & Download | High | 12 | 12 |
| US13 | FR16: Adaptive Quality | High | 10 | 13 |
| US14 | FR17: Image Library & Reuse | Medium | 12 | 14 |
| US15 | FR11: Command Palette | Medium | 7 | 14 |
| US16 | FR13: Focus Mode | Medium | 8 | 14 |
| US17 | FR14: Slideshow Mode | Low | 7 | 14 |
| US18 | FR18: Auto-Arrange | Low | 7 | 14 |
Task Format Validation ✅
All 331 tasks follow the required format:
- [ ] [T###] [P?] [US#?] Description with file path
Examples:
✅ - [ ] T036 [P] [US1] Create User model in backend/app/database/models/user.py
✅ - [ ] T100 [US4] Initialize Konva.js Stage in frontend/src/lib/canvas/Stage.svelte
✅ - [ ] T163 [US9] Implement align top/bottom in frontend/src/lib/canvas/operations/align.ts
Validation Results:
- ✅ All tasks have checkbox
- [ ] - ✅ All tasks have sequential ID (T001-T331)
- ✅ Parallelizable tasks marked with [P]
- ✅ User story tasks have [US#] label
- ✅ All tasks have specific file paths
- ✅ All tasks are actionable (clear description)
Parallel Execution Opportunities
Phase 1 (Setup): 13 Parallel Tasks
Tasks T002-T020 (excluding sequential dependencies) can run simultaneously.
Example Team Split:
- Developer 1: Nix config (T002, T003, T004, T009, T317, T318)
- Developer 2: Backend setup (T005, T007, T011, T013, T015, T017, T018)
- Developer 3: Frontend setup (T006, T008, T012, T014, T016)
Phase 2 (Foundational): 10 Parallel Tasks
Tasks T021-T035 - most can run in parallel after T021-T024 complete.
Phase 3+ (User Stories): Full Parallelization
Each user story is independent after foundational phase:
Parallel Story Development (Example Week 9-12):
- Team A: US9 (Alignment) + US12 (Export)
- Team B: US10 (Groups) + US13 (Quality)
- Team C: US11 (Sharing)
All teams work simultaneously on different stories!
MVP Scope Recommendation
For fastest time-to-market, implement in this order:
MVP Phase 1 (Weeks 1-8) - 120 Tasks
Deliverable: Functional reference board app
- Phase 1-2: Setup (35 tasks)
- US1: Authentication (20 tasks)
- US2: Board Management (20 tasks)
- US3: Image Upload (24 tasks)
- US4-US5: Canvas basics (22 tasks)
- US6: Transformations (12 tasks)
Result: Users can create boards, upload images, position and transform them.
MVP Phase 2 (Weeks 9-12) - 88 Tasks
Deliverable: Collaboration features
- US7-US10: Multi-select, clipboard, alignment, groups (47 tasks)
- US11: Sharing (19 tasks)
- US12: Export (12 tasks)
- US13: Adaptive quality (10 tasks)
Result: Full collaboration and export capabilities.
Polish Phase (Weeks 13-16) - 123 Tasks
Deliverable: Production-ready
- US14-US18: Library, palette, focus, slideshow, arrange (41 tasks)
- Performance optimization (10 tasks)
- Testing (15 tasks)
- Accessibility (13 tasks)
- Deployment (23 tasks)
- Documentation (21 tasks)
Result: Polished, tested, deployed application.
Independent Test Criteria
Each user story phase includes independent test criteria that can be verified without other features:
Example (US1 - Authentication):
- ✅ Users can register with valid email/password
- ✅ Users can login and receive JWT token
- ✅ Protected endpoints reject unauthenticated requests
- ✅ Password validation enforces complexity rules
This enables:
- Feature flag rollouts (deploy incomplete features, hidden behind flags)
- A/B testing individual features
- Incremental beta releases
- Independent QA validation
Technology Stack Reference
All tasks reference this verified stack:
Frontend:
- Svelte + SvelteKit (framework)
- Konva.js (canvas library)
- Vite (build tool)
- Vitest + Testing Library (testing)
Backend:
- FastAPI (web framework)
- SQLAlchemy + Alembic (database ORM + migrations)
- Pydantic (validation)
- Pillow + ImageMagick (image processing)
- pytest (testing)
Infrastructure:
- PostgreSQL (database)
- MinIO (S3-compatible storage)
- Nginx (reverse proxy)
- Nix (deployment)
All verified in nixpkgs - see VERIFICATION-COMPLETE.md
Next Actions
Immediate (Today)
-
Review tasks.md:
cat specs/001-reference-board-viewer/tasks.md -
Understand the format:
- [T###] = Task ID
- [P] = Parallelizable
- [US#] = User Story label
-
Choose approach:
- Full MVP (120 tasks, Weeks 1-8)
- OR Complete v1.0 (331 tasks, Weeks 1-16)
This Week (Week 1)
Start with Phase 1 (T001-T020):
# T001: Initialize Git structure
# T002: Create flake.nix
# T003: Update shell.nix
# ... follow tasks.md sequentially
Team Organization
If you have a team:
- Backend Developer: Focus on backend tasks in each phase
- Frontend Developer: Focus on frontend tasks in each phase
- Full-Stack: Can work on any tasks marked [P]
If solo:
- Follow tasks sequentially (T001 → T002 → T003...)
- Skip tasks marked [P] in same phase to avoid context switching
- Complete one user story fully before moving to next
Files Created
specs/001-reference-board-viewer/
├── tasks.md ✅ 331 tasks, 25 phases (THIS FILE)
├── plan.md ✅ 16-week implementation plan
├── spec.md ✅ 18 functional requirements
├── data-model.md ✅ Database schema
├── tech-research.md ✅ Technology analysis
├── nix-package-verification.md ✅ Package verification
├── VERIFICATION-COMPLETE.md ✅ Verification summary
├── PLANNING-COMPLETE.md ✅ Planning summary
├── TASKS-GENERATED.md ✅ This document
├── quickstart.md ✅ Developer guide
├── contracts/
│ └── api.yaml ✅ OpenAPI 3.0 spec
└── checklists/
└── requirements.md ✅ Quality validation
Total: ~6,500 lines of comprehensive planning & task breakdown
Conclusion
✅ Task Generation: COMPLETE
✅ Format Validation: PASSED
✅ Dependency Analysis: MAPPED
✅ Parallel Opportunities: IDENTIFIED
✅ MVP Scope: DEFINED
Status: ✅ READY TO BEGIN IMPLEMENTATION
Start with T001 and work through sequentially, or split among team members using the parallel execution examples!
🚀 Let's build this!