284 lines
8.0 KiB
Markdown
284 lines
8.0 KiB
Markdown
# ✅ TASKS GENERATED: Implementation Ready
|
|
|
|
**Date:** 2025-11-02
|
|
**Feature:** 001-reference-board-viewer
|
|
**Branch:** 001-reference-board-viewer
|
|
**Status:** ✅ Ready for Week 1 Execution
|
|
|
|
---
|
|
|
|
## Summary
|
|
|
|
Comprehensive task breakdown generated with **331 actionable tasks** organized by user story for independent, parallel implementation.
|
|
|
|
---
|
|
|
|
## Generated Artifacts
|
|
|
|
### tasks.md Statistics
|
|
|
|
- **Total Tasks:** 331
|
|
- **Phases:** 25 (1 setup + 1 foundational + 18 user stories + 5 cross-cutting)
|
|
- **User Stories:** 18 (mapped from FR1-FR18 in spec.md)
|
|
- **Parallelizable Tasks:** 142 tasks marked with [P]
|
|
- **Average Tasks per User Story:** 18 tasks
|
|
|
|
### Task Organization
|
|
|
|
**By Priority:**
|
|
- Critical stories (US1-US6): 126 tasks
|
|
- High priority stories (US7-US13): 88 tasks
|
|
- Medium priority stories (US14-US16): 27 tasks
|
|
- Low priority stories (US17-US18): 14 tasks
|
|
- Infrastructure/Polish: 76 tasks
|
|
|
|
**By Component:**
|
|
- Backend tasks: ~160 tasks
|
|
- Frontend tasks: ~145 tasks
|
|
- Infrastructure: ~26 tasks
|
|
|
|
---
|
|
|
|
## User Story Mapping
|
|
|
|
Each functional requirement from spec.md mapped to user story:
|
|
|
|
| Story | Requirement | Priority | Tasks | Week |
|
|
|-------|-------------|----------|-------|------|
|
|
| US1 | FR1: Authentication | Critical | 20 | 2 |
|
|
| US2 | FR2: Board Management | Critical | 20 | 3 |
|
|
| US3 | FR4: Image Upload | Critical | 24 | 4 |
|
|
| US4 | FR12: Canvas Navigation | Critical | 11 | 5 |
|
|
| US5 | FR5: Image Positioning | Critical | 19 | 5-6 |
|
|
| US6 | FR8: Transformations | Critical | 12 | 6 |
|
|
| US7 | FR9: Multi-Selection | High | 11 | 7 |
|
|
| US8 | FR10: Clipboard Operations | High | 10 | 7 |
|
|
| US9 | FR6: Alignment & Distribution | High | 9 | 10 |
|
|
| US10 | FR7: Grouping & Annotations | High | 17 | 9 |
|
|
| US11 | FR3: Board Sharing | High | 19 | 11 |
|
|
| US12 | FR15: Export & Download | High | 12 | 12 |
|
|
| US13 | FR16: Adaptive Quality | High | 10 | 13 |
|
|
| US14 | FR17: Image Library & Reuse | Medium | 12 | 14 |
|
|
| US15 | FR11: Command Palette | Medium | 7 | 14 |
|
|
| US16 | FR13: Focus Mode | Medium | 8 | 14 |
|
|
| US17 | FR14: Slideshow Mode | Low | 7 | 14 |
|
|
| US18 | FR18: Auto-Arrange | Low | 7 | 14 |
|
|
|
|
---
|
|
|
|
## Task Format Validation ✅
|
|
|
|
All 331 tasks follow the required format:
|
|
|
|
```
|
|
- [ ] [T###] [P?] [US#?] Description with file path
|
|
```
|
|
|
|
**Examples:**
|
|
```
|
|
✅ - [ ] T036 [P] [US1] Create User model in backend/app/database/models/user.py
|
|
✅ - [ ] T100 [US4] Initialize Konva.js Stage in frontend/src/lib/canvas/Stage.svelte
|
|
✅ - [ ] T163 [US9] Implement align top/bottom in frontend/src/lib/canvas/operations/align.ts
|
|
```
|
|
|
|
**Validation Results:**
|
|
- ✅ All tasks have checkbox `- [ ]`
|
|
- ✅ All tasks have sequential ID (T001-T331)
|
|
- ✅ Parallelizable tasks marked with [P]
|
|
- ✅ User story tasks have [US#] label
|
|
- ✅ All tasks have specific file paths
|
|
- ✅ All tasks are actionable (clear description)
|
|
|
|
---
|
|
|
|
## Parallel Execution Opportunities
|
|
|
|
### Phase 1 (Setup): 13 Parallel Tasks
|
|
Tasks T002-T020 (excluding sequential dependencies) can run simultaneously.
|
|
|
|
**Example Team Split:**
|
|
- Developer 1: Nix config (T002, T003, T004, T009, T317, T318)
|
|
- Developer 2: Backend setup (T005, T007, T011, T013, T015, T017, T018)
|
|
- Developer 3: Frontend setup (T006, T008, T012, T014, T016)
|
|
|
|
### Phase 2 (Foundational): 10 Parallel Tasks
|
|
Tasks T021-T035 - most can run in parallel after T021-T024 complete.
|
|
|
|
### Phase 3+ (User Stories): Full Parallelization
|
|
Each user story is independent after foundational phase:
|
|
|
|
**Parallel Story Development (Example Week 9-12):**
|
|
- Team A: US9 (Alignment) + US12 (Export)
|
|
- Team B: US10 (Groups) + US13 (Quality)
|
|
- Team C: US11 (Sharing)
|
|
|
|
All teams work simultaneously on different stories!
|
|
|
|
---
|
|
|
|
## MVP Scope Recommendation
|
|
|
|
For fastest time-to-market, implement in this order:
|
|
|
|
### MVP Phase 1 (Weeks 1-8) - 120 Tasks
|
|
**Deliverable:** Functional reference board app
|
|
|
|
- Phase 1-2: Setup (35 tasks)
|
|
- US1: Authentication (20 tasks)
|
|
- US2: Board Management (20 tasks)
|
|
- US3: Image Upload (24 tasks)
|
|
- US4-US5: Canvas basics (22 tasks)
|
|
- US6: Transformations (12 tasks)
|
|
|
|
**Result:** Users can create boards, upload images, position and transform them.
|
|
|
|
### MVP Phase 2 (Weeks 9-12) - 88 Tasks
|
|
**Deliverable:** Collaboration features
|
|
|
|
- US7-US10: Multi-select, clipboard, alignment, groups (47 tasks)
|
|
- US11: Sharing (19 tasks)
|
|
- US12: Export (12 tasks)
|
|
- US13: Adaptive quality (10 tasks)
|
|
|
|
**Result:** Full collaboration and export capabilities.
|
|
|
|
### Polish Phase (Weeks 13-16) - 123 Tasks
|
|
**Deliverable:** Production-ready
|
|
|
|
- US14-US18: Library, palette, focus, slideshow, arrange (41 tasks)
|
|
- Performance optimization (10 tasks)
|
|
- Testing (15 tasks)
|
|
- Accessibility (13 tasks)
|
|
- Deployment (23 tasks)
|
|
- Documentation (21 tasks)
|
|
|
|
**Result:** Polished, tested, deployed application.
|
|
|
|
---
|
|
|
|
## Independent Test Criteria
|
|
|
|
Each user story phase includes independent test criteria that can be verified without other features:
|
|
|
|
**Example (US1 - Authentication):**
|
|
- ✅ Users can register with valid email/password
|
|
- ✅ Users can login and receive JWT token
|
|
- ✅ Protected endpoints reject unauthenticated requests
|
|
- ✅ Password validation enforces complexity rules
|
|
|
|
This enables:
|
|
- Feature flag rollouts (deploy incomplete features, hidden behind flags)
|
|
- A/B testing individual features
|
|
- Incremental beta releases
|
|
- Independent QA validation
|
|
|
|
---
|
|
|
|
## Technology Stack Reference
|
|
|
|
**All tasks reference this verified stack:**
|
|
|
|
**Frontend:**
|
|
- Svelte + SvelteKit (framework)
|
|
- Konva.js (canvas library)
|
|
- Vite (build tool)
|
|
- Vitest + Testing Library (testing)
|
|
|
|
**Backend:**
|
|
- FastAPI (web framework)
|
|
- SQLAlchemy + Alembic (database ORM + migrations)
|
|
- Pydantic (validation)
|
|
- Pillow + ImageMagick (image processing)
|
|
- pytest (testing)
|
|
|
|
**Infrastructure:**
|
|
- PostgreSQL (database)
|
|
- MinIO (S3-compatible storage)
|
|
- Nginx (reverse proxy)
|
|
- Nix (deployment)
|
|
|
|
**All verified in nixpkgs** - see VERIFICATION-COMPLETE.md
|
|
|
|
---
|
|
|
|
## Next Actions
|
|
|
|
### Immediate (Today)
|
|
|
|
1. **Review tasks.md:**
|
|
```bash
|
|
cat specs/001-reference-board-viewer/tasks.md
|
|
```
|
|
|
|
2. **Understand the format:**
|
|
- [T###] = Task ID
|
|
- [P] = Parallelizable
|
|
- [US#] = User Story label
|
|
|
|
3. **Choose approach:**
|
|
- Full MVP (120 tasks, Weeks 1-8)
|
|
- OR Complete v1.0 (331 tasks, Weeks 1-16)
|
|
|
|
### This Week (Week 1)
|
|
|
|
Start with Phase 1 (T001-T020):
|
|
```bash
|
|
# T001: Initialize Git structure
|
|
# T002: Create flake.nix
|
|
# T003: Update shell.nix
|
|
# ... follow tasks.md sequentially
|
|
```
|
|
|
|
### Team Organization
|
|
|
|
If you have a team:
|
|
- **Backend Developer:** Focus on backend tasks in each phase
|
|
- **Frontend Developer:** Focus on frontend tasks in each phase
|
|
- **Full-Stack:** Can work on any tasks marked [P]
|
|
|
|
If solo:
|
|
- Follow tasks sequentially (T001 → T002 → T003...)
|
|
- Skip tasks marked [P] in same phase to avoid context switching
|
|
- Complete one user story fully before moving to next
|
|
|
|
---
|
|
|
|
## Files Created
|
|
|
|
```
|
|
specs/001-reference-board-viewer/
|
|
├── tasks.md ✅ 331 tasks, 25 phases (THIS FILE)
|
|
├── plan.md ✅ 16-week implementation plan
|
|
├── spec.md ✅ 18 functional requirements
|
|
├── data-model.md ✅ Database schema
|
|
├── tech-research.md ✅ Technology analysis
|
|
├── nix-package-verification.md ✅ Package verification
|
|
├── VERIFICATION-COMPLETE.md ✅ Verification summary
|
|
├── PLANNING-COMPLETE.md ✅ Planning summary
|
|
├── TASKS-GENERATED.md ✅ This document
|
|
├── quickstart.md ✅ Developer guide
|
|
├── contracts/
|
|
│ └── api.yaml ✅ OpenAPI 3.0 spec
|
|
└── checklists/
|
|
└── requirements.md ✅ Quality validation
|
|
|
|
Total: ~6,500 lines of comprehensive planning & task breakdown
|
|
```
|
|
|
|
---
|
|
|
|
## Conclusion
|
|
|
|
✅ **Task Generation:** COMPLETE
|
|
✅ **Format Validation:** PASSED
|
|
✅ **Dependency Analysis:** MAPPED
|
|
✅ **Parallel Opportunities:** IDENTIFIED
|
|
✅ **MVP Scope:** DEFINED
|
|
|
|
**Status:** ✅ READY TO BEGIN IMPLEMENTATION
|
|
|
|
Start with T001 and work through sequentially, or split among team members using the parallel execution examples!
|
|
|
|
🚀 **Let's build this!**
|
|
|