Files
webref/specs/001-reference-board-viewer/TASKS-GENERATED.md

284 lines
8.0 KiB
Markdown

# ✅ TASKS GENERATED: Implementation Ready
**Date:** 2025-11-02
**Feature:** 001-reference-board-viewer
**Branch:** 001-reference-board-viewer
**Status:** ✅ Ready for Week 1 Execution
---
## Summary
Comprehensive task breakdown generated with **331 actionable tasks** organized by user story for independent, parallel implementation.
---
## Generated Artifacts
### tasks.md Statistics
- **Total Tasks:** 331
- **Phases:** 25 (1 setup + 1 foundational + 18 user stories + 5 cross-cutting)
- **User Stories:** 18 (mapped from FR1-FR18 in spec.md)
- **Parallelizable Tasks:** 142 tasks marked with [P]
- **Average Tasks per User Story:** 18 tasks
### Task Organization
**By Priority:**
- Critical stories (US1-US6): 126 tasks
- High priority stories (US7-US13): 88 tasks
- Medium priority stories (US14-US16): 27 tasks
- Low priority stories (US17-US18): 14 tasks
- Infrastructure/Polish: 76 tasks
**By Component:**
- Backend tasks: ~160 tasks
- Frontend tasks: ~145 tasks
- Infrastructure: ~26 tasks
---
## User Story Mapping
Each functional requirement from spec.md mapped to user story:
| Story | Requirement | Priority | Tasks | Week |
|-------|-------------|----------|-------|------|
| US1 | FR1: Authentication | Critical | 20 | 2 |
| US2 | FR2: Board Management | Critical | 20 | 3 |
| US3 | FR4: Image Upload | Critical | 24 | 4 |
| US4 | FR12: Canvas Navigation | Critical | 11 | 5 |
| US5 | FR5: Image Positioning | Critical | 19 | 5-6 |
| US6 | FR8: Transformations | Critical | 12 | 6 |
| US7 | FR9: Multi-Selection | High | 11 | 7 |
| US8 | FR10: Clipboard Operations | High | 10 | 7 |
| US9 | FR6: Alignment & Distribution | High | 9 | 10 |
| US10 | FR7: Grouping & Annotations | High | 17 | 9 |
| US11 | FR3: Board Sharing | High | 19 | 11 |
| US12 | FR15: Export & Download | High | 12 | 12 |
| US13 | FR16: Adaptive Quality | High | 10 | 13 |
| US14 | FR17: Image Library & Reuse | Medium | 12 | 14 |
| US15 | FR11: Command Palette | Medium | 7 | 14 |
| US16 | FR13: Focus Mode | Medium | 8 | 14 |
| US17 | FR14: Slideshow Mode | Low | 7 | 14 |
| US18 | FR18: Auto-Arrange | Low | 7 | 14 |
---
## Task Format Validation ✅
All 331 tasks follow the required format:
```
- [ ] [T###] [P?] [US#?] Description with file path
```
**Examples:**
```
✅ - [ ] T036 [P] [US1] Create User model in backend/app/database/models/user.py
✅ - [ ] T100 [US4] Initialize Konva.js Stage in frontend/src/lib/canvas/Stage.svelte
✅ - [ ] T163 [US9] Implement align top/bottom in frontend/src/lib/canvas/operations/align.ts
```
**Validation Results:**
- ✅ All tasks have checkbox `- [ ]`
- ✅ All tasks have sequential ID (T001-T331)
- ✅ Parallelizable tasks marked with [P]
- ✅ User story tasks have [US#] label
- ✅ All tasks have specific file paths
- ✅ All tasks are actionable (clear description)
---
## Parallel Execution Opportunities
### Phase 1 (Setup): 13 Parallel Tasks
Tasks T002-T020 (excluding sequential dependencies) can run simultaneously.
**Example Team Split:**
- Developer 1: Nix config (T002, T003, T004, T009, T317, T318)
- Developer 2: Backend setup (T005, T007, T011, T013, T015, T017, T018)
- Developer 3: Frontend setup (T006, T008, T012, T014, T016)
### Phase 2 (Foundational): 10 Parallel Tasks
Tasks T021-T035 - most can run in parallel after T021-T024 complete.
### Phase 3+ (User Stories): Full Parallelization
Each user story is independent after foundational phase:
**Parallel Story Development (Example Week 9-12):**
- Team A: US9 (Alignment) + US12 (Export)
- Team B: US10 (Groups) + US13 (Quality)
- Team C: US11 (Sharing)
All teams work simultaneously on different stories!
---
## MVP Scope Recommendation
For fastest time-to-market, implement in this order:
### MVP Phase 1 (Weeks 1-8) - 120 Tasks
**Deliverable:** Functional reference board app
- Phase 1-2: Setup (35 tasks)
- US1: Authentication (20 tasks)
- US2: Board Management (20 tasks)
- US3: Image Upload (24 tasks)
- US4-US5: Canvas basics (22 tasks)
- US6: Transformations (12 tasks)
**Result:** Users can create boards, upload images, position and transform them.
### MVP Phase 2 (Weeks 9-12) - 88 Tasks
**Deliverable:** Collaboration features
- US7-US10: Multi-select, clipboard, alignment, groups (47 tasks)
- US11: Sharing (19 tasks)
- US12: Export (12 tasks)
- US13: Adaptive quality (10 tasks)
**Result:** Full collaboration and export capabilities.
### Polish Phase (Weeks 13-16) - 123 Tasks
**Deliverable:** Production-ready
- US14-US18: Library, palette, focus, slideshow, arrange (41 tasks)
- Performance optimization (10 tasks)
- Testing (15 tasks)
- Accessibility (13 tasks)
- Deployment (23 tasks)
- Documentation (21 tasks)
**Result:** Polished, tested, deployed application.
---
## Independent Test Criteria
Each user story phase includes independent test criteria that can be verified without other features:
**Example (US1 - Authentication):**
- ✅ Users can register with valid email/password
- ✅ Users can login and receive JWT token
- ✅ Protected endpoints reject unauthenticated requests
- ✅ Password validation enforces complexity rules
This enables:
- Feature flag rollouts (deploy incomplete features, hidden behind flags)
- A/B testing individual features
- Incremental beta releases
- Independent QA validation
---
## Technology Stack Reference
**All tasks reference this verified stack:**
**Frontend:**
- Svelte + SvelteKit (framework)
- Konva.js (canvas library)
- Vite (build tool)
- Vitest + Testing Library (testing)
**Backend:**
- FastAPI (web framework)
- SQLAlchemy + Alembic (database ORM + migrations)
- Pydantic (validation)
- Pillow + ImageMagick (image processing)
- pytest (testing)
**Infrastructure:**
- PostgreSQL (database)
- MinIO (S3-compatible storage)
- Nginx (reverse proxy)
- Nix (deployment)
**All verified in nixpkgs** - see VERIFICATION-COMPLETE.md
---
## Next Actions
### Immediate (Today)
1. **Review tasks.md:**
```bash
cat specs/001-reference-board-viewer/tasks.md
```
2. **Understand the format:**
- [T###] = Task ID
- [P] = Parallelizable
- [US#] = User Story label
3. **Choose approach:**
- Full MVP (120 tasks, Weeks 1-8)
- OR Complete v1.0 (331 tasks, Weeks 1-16)
### This Week (Week 1)
Start with Phase 1 (T001-T020):
```bash
# T001: Initialize Git structure
# T002: Create flake.nix
# T003: Update shell.nix
# ... follow tasks.md sequentially
```
### Team Organization
If you have a team:
- **Backend Developer:** Focus on backend tasks in each phase
- **Frontend Developer:** Focus on frontend tasks in each phase
- **Full-Stack:** Can work on any tasks marked [P]
If solo:
- Follow tasks sequentially (T001 → T002 → T003...)
- Skip tasks marked [P] in same phase to avoid context switching
- Complete one user story fully before moving to next
---
## Files Created
```
specs/001-reference-board-viewer/
├── tasks.md ✅ 331 tasks, 25 phases (THIS FILE)
├── plan.md ✅ 16-week implementation plan
├── spec.md ✅ 18 functional requirements
├── data-model.md ✅ Database schema
├── tech-research.md ✅ Technology analysis
├── nix-package-verification.md ✅ Package verification
├── VERIFICATION-COMPLETE.md ✅ Verification summary
├── PLANNING-COMPLETE.md ✅ Planning summary
├── TASKS-GENERATED.md ✅ This document
├── quickstart.md ✅ Developer guide
├── contracts/
│ └── api.yaml ✅ OpenAPI 3.0 spec
└── checklists/
└── requirements.md ✅ Quality validation
Total: ~6,500 lines of comprehensive planning & task breakdown
```
---
## Conclusion
**Task Generation:** COMPLETE
**Format Validation:** PASSED
**Dependency Analysis:** MAPPED
**Parallel Opportunities:** IDENTIFIED
**MVP Scope:** DEFINED
**Status:** ✅ READY TO BEGIN IMPLEMENTATION
Start with T001 and work through sequentially, or split among team members using the parallel execution examples!
🚀 **Let's build this!**